Key takeaways
- Verify current state building registration/licensing and mandatory insurances appropriate to your project value and type.
- Compare itemised inclusions, exclusions, prime-cost and provisional-sum schedules rather than bottom-line numbers alone.
- Clarify who supervises your site day-to-day, how often updates are shared, and how variations are documented.
1. Registration, licensing and insurance
Residential building work in Australia is regulated at state and territory level, with specific licensing classes, written contract thresholds and domestic building insurance requirements depending on location and scope.
Before signing any agreement, ask for the builder’s exact legal entity name, relevant contractor licence/registration details for your state, public liability cover, construction works insurance and statutory home warranty/domestic building insurance where applicable—and verify them on the official state register.
2. Scope clarity: what is included and what is excluded?
Two proposals that look $40,000 apart on page one frequently turn out to price completely different scopes once you read the fine print. One builder may have included earthworks, window furnishings, electrical feature lighting, insulation upgrades and rubbish removal, while another has excluded them or listed unrealistically low allowances.
- Ask for an itemised schedule of inclusions and explicit exclusions.
- Check every Prime Cost (PC) and Provisional Sum (PS) figure—are the allowances realistic for the fixtures you actually want?
- Confirm whether site facilities, skip bins, temporary fencing, engineering inspections and post-build cleaning are included.
3. Site supervision and trade continuity
Quality on a residential site comes down to who is actually checking set-outs, waterproofing substrates, flashing junctions and framing levels before plasterboard covers them up.
Ask who your day-to-day site contact will be, how many active sites they oversee simultaneously, and whether regular trades (plumbers, electricians, waterproofers, cabinetmakers) are long-standing partners familiar with the builder’s standards.
4. Programme realism and variation handling
Over-optimistic start dates or compressed build durations help nobody if materials have not been ordered. Ask what pre-construction milestones—permits, engineering, window lead times, joinery sign-off—must finish before demolition or excavation begins.
Equally important, ask how variations work when you request a change or if concealed damage is uncovered in a renovation. Every variation should be explained, priced and approved in writing before proceeding.